Road Closures & Construction

Road Resurfacing Project

  • Estimated duration of Project: September 16th - October 31st
  • See map below of streets that will be affected and the flow-chart of the work being done
  • Each street will only be impacted for a few days
  • This project will consist of two different resurface types: double application + restriping
  • This will impact traffic due to road closures during the resurfacing
  • Expect delays, follow the construction signs and slowdown through the resurfacing zone

Streets to be resurfaced

Rough Schedule of Resurfacing Project

Bridge over Tuolumne River

  • Stanislaus County will be working on the north side of the bridge over the Tuolumne River to the south side of the railroad tracks at Yosemite Blvd.
  • Estimated duration is from September 16, 2019 through November 20, 2019.
  • This project includes installing ADA compliant curb ramps, modifying traffic signals and placing asphalt overlay.
  • Expect delays, follow construction signs and slow-down through the construction zone.